Monday, February 1, 2010

Catching up on progress!

Okay okay -- our blogging efforts were not great during January (actually non-existent!).  We had some issues with getting pictures to load for some reason - at least that's one excuse.  So here's a quick look at current progress --

This shows the fireplace with a propped up mantle.  The cool thing about the mantle is that it's a wonderful piece of an old fir beam from a warehouse someplace.  Peter selected it and made sure it contained a few nail holes, etc.  I'm starting to visualize Christmas stockings hanging. . . . .


                                                                                        This is at the far end of the living room area showing what will be display shelves and cupboards below.
Jake is in the foreground practicing his "stay" command (he's in training class currently!)












This was my weekend project - wallpapering the powder room.  The paper is textured with a bit of metallic in the leaves - blends really well with both the sink and stone floor (which is covered in cardboard at this point.  The sink is now in as well as the wood trim pieces.  It turned out pretty good - now we just need a faucet and toilet!






This is in the mudroom - and shows the new light fixtures which were installed today as well as the cabinets and counter.

  





This is in the master bedroom - built in night stand/drawers and shelving. You can also see a little of the ceiling trim - which will have lighting in it.  The cabinets are painted what will be the eventual color of this room.





















Casita "kitchen" area (awaiting a sink and undercounter refrigerator - and the bathroom showing the corner shower in process of finishing up the tiling, and the vanity.
Below is the bedroom in the casita which will have a small built-in desk area.



Elevator installation began today!  On the left is the door on the main floor and on the right is the door on the upper level.  Lots of scaffolding in a pretty small space!   Below shows a view looking down from the upper floor - my foot in the lower corner to give perspective. . . 


What's next??   More cabinets to be installed this week (office, laundry room): slab for counter in the master bath; finish installation of elevator; marmoleum flooring in the laundry room and casita . . . .
Current EMID ("estimated move-in date") - mid-April.

1 comment:

Grammie said...

WOw wee wow wow
Love the powder room...great wallpaper choice. It is so exciting seeing all of your months (years) of planning coming together. The elevator is impressive.
smiles, karen