First we had to remove 60 stumps so we could dig some trenches. We planned on a number of trenches for utilities and a MAJOR drainage system to help dry out the property. Bringing in the utilities in one trench from the road, about 700 feet, was the start of this 2 month project. Then we brought in water in the main drainage trench. The next trench cut across the property at the edge of the building site. And we reworked the original drainage trench along the driveway. This all ended in the large pipe trench going over the hill.